Biomass Fuel Pre-Shredding Project in Heilongjiang, China

Biomass Fuel Pre-Shredding Project in Heilongjiang, China

2020-10-12 1228
Capacity:50–60 Tons/Hour
Application:Shred Crop Stalks to Produce Fuel for Power Station
Material:Corn Stalks

A biomass cogeneration project in Heilongjiang, China, required the shredding and pre-processing of biomass fuels such as corn stalks, which were in bales and therefore required a high level of shredding equipment. The biomass shredder has been optimized to ensure a continuous supply of raw materials and a 24-hour continuous supply of material, which is particularly satisfactory to the customer. The shredded size of 100 mm and the output of 50–60 t/h is in line with the target set by the customer.

Related Equipment

Related Project