The Southeast Asia NNBP 25MW Biomass Power Station Project is a biomass power generation project using sugarcane leaves as the combustion raw material, turning sugarcane leaves into treasure, creating considerable economic benefits while providing stable and reliable electricity for the local area. The main equipment of this biomass shredding line is 3 sets of twin shaft shredder, which can shred sugarcane leaves to the size of 100-200mm with an output of 30-40t/h. The client fully affirmed the technical strength and level of GEP's design, R&D and manufacturing in the field of biomass power generation, and expressed their appreciation for the efforts made by GEP in the construction of the project.