The project is the third phase expansion project of Macao Waste Incineration Center invested and constructed by the Macao Special Administrative Region Government, with a daily waste processing capacity of 1,300 tons. GEP provides a complete set of waste tire shredding line, and the shredded tires are incinerated for power generation. Customers have very strict requirements on equipment quality control, and the engineering uses international first-line brand equipment. GEP's equipment has reached a high international level from performance design, quality control to on-site installation and commissioning.