Hazardous Waste Pretreatment

The basic treatment steps of hazardous waste include classification, pretreatment, and final disposal. Hazardous waste pretreatment includes physical and chemical methods. Only after pretreatment can hazardous waste enter into final disposal facilities such as incineration or landfill.

Why Is GEP's Intelligent Building Type Hazardous Waste Crushing System Safer?

The intelligent building type hazardous waste crushing system is a new type of hazardous waste crushing equipment developed by GEP for the characteristics of hazardous waste such as toxicity, corrosiveness, flammability, reactivity, and infectivity. It…

Why Is GEP's Intelligent Building Type Hazardous Waste Crushing System Safer?
Abandon Or Destroy? Retired Ships Have New Ways Out!

The rapid development of water transportation industry has accelerated the speed of ship replacement. The limited service life of ships and strict environmental requirements also result in a large number of ships having to retire every year due to their…

Abandon Or Destroy? Retired Ships Have New Ways Out!
Shredding and Pre-treatment of Hazardous Waste in Gas Stations

The main categories of hazardous waste in gas stations include waste fuel treasure, waste lamps, waste batteries, waste toner cartridges, etc. After professional sorting and pretreatment, it can realize the harmless treatment of hazardous waste. For…

Shredding and Pre-treatment of Hazardous Waste in Gas Stations
How Do You Pre-treat Hazardous Waste Small Packages? This Project Might Help You!

Project OverviewAs a key hazardous waste comprehensive disposal enterprise in Zhejiang Province, Taizhou Dechang Environmental Protection Co., Ltd. is mainly engaged in the collection, transportation, disposal of hazardous waste and investment and…

How Do You Pre-treat Hazardous Waste Small Packages? This Project Might Help You!
hazardous waste pretreatment equipment is ready for delivery to Xinjiang

On November 20,GEP complete hazardous waste pretreatment equipment was shipped to Xinjiang, more than 3000 kilometers away, to participate in the construction of the local waste resource disposal project. GEP Ecotechrecently signed a number of hazardous…

hazardous waste pretreatment equipment is ready for delivery to Xinjiang hazardous waste pretreatment equipment is ready for delivery to Xinjiang hazardous waste pretreatment equipment is ready for delivery to Xinjiang